IBM Semeru Runtime End of Life (EOL) Dates and End of Support (EOS) Dates
IBM Semeru Runtime end of life (EOL) and end of support (EOS) dates: 4 IBM Semeru Runtime versions have reached EOL, including IBM Semeru Runtime 26 (EOL date: Sep 30, 2026) — no longer receiving security updates or patches. IBM Semeru Runtime 27 reaches its End of Support date on Mar 31, 2027 — plan your upgrade path now. IBM Semeru Runtime 25.0.5.0 LTS is the current supported release, with support through Sep 30, 2031 — 5 versions in active support. Also see IBM Db2 end of life dates for related end-of-life information.
Currently Supported IBM Semeru Runtime Releases - Active EOS/EOSL Support (5)
| Release | Released | End of Service (EOS) | Latest | LTS |
|---|---|---|---|---|
| 25 (LTS) | (1 year and 1 month ago) | (in 4 years and 10 months) | 25.0.5.0 (3 weeks and 4 days ago) | LTS |
| 21 (LTS) | (3 years and 2 months ago) | (in 3 years and 1 month) | 21.0.10+7.1 (8 months ago) | LTS |
| 17 (LTS) | (4 years and 11 months ago) | (in 11 months) | 17.0.21.0 (3 weeks and 4 days ago) | LTS |
| 8 (LTS) | (5 years and 2 months ago) | (in 4 years and 1 month) | 8.0.512.0 (2 weeks and 4 days ago) | LTS |
| 11 (LTS) | (5 years and 2 months ago) | (in 11 months) | 11.0.33.0 (2 weeks and 4 days ago) | LTS |
IBM Semeru Runtime Releases Nearing End of Life - Support Ending Soon (1)
| Release | Released | End of Service (EOS) | Latest | LTS |
|---|---|---|---|---|
| 27 | (2 months ago) | (in 4 months) | 27.0.1.0 (3 weeks and 3 days ago) | - |
IBM Semeru Runtime End of Life (EOL) Releases - No Longer Supported (4)
| Release | Released | End of Service (EOS) | Latest | LTS |
|---|---|---|---|---|
| 26 | (8 months ago) | (1 month and 3 weeks ago) | 26.0.2.10 (2 months ago) | - |
| 24 | (1 year and 7 months ago) | (1 year and 1 month ago) | 24.0.2+12 (1 year and 3 months ago) | - |
| 23 | (2 years and 2 months ago) | (1 year and 7 months ago) | 23.0.2+7 (1 year and 9 months ago) | - |
| 22 | (2 years and 6 months ago) | (2 years and 2 months ago) | 22.0.2+9 (2 years and 2 months ago) | - |
Planning a Java upgrade? Here is the IBM Semeru Runtime end of life schedule for every release, so you know exactly how long each build of the Semeru Runtimes stays patched by IBM before you have to move on.
IBM Semeru Runtime End of Life Dates by Version
Each release has a launch date and a final patch date. IBM states that every future date is a prediction that can change as the open source projects evolve, and the Semeru Runtimes follow the same pattern. This table summarizes the support status of each Java version today, and the JDK builds IBM ships follow it:
| Version | Release type | Released | Support ends |
|---|---|---|---|
| 27 | Feature | Sep 2026 | 31 Mar 2027 |
| 25 | LTS | Sep 2025 | 30 Sep 2031 |
| 21 | LTS | Jan 2024 | 31 Dec 2029 |
| 17 | LTS | Dec 2021 | 31 Oct 2027 |
| 11 | LTS | Sep 2021 | 31 Oct 2027 |
| 8 | LTS | Jul 2021 | 31 Dec 2030 |
Java 8 and Java 11 End of Life Dates
The oldest Java 8 build runs until 31 Dec 2030, the longest tail of any LTS line except 25. Java 11 ends sooner, on 31 Oct 2027, the same day as Java 17, so plan those two moves together.
LTS Release Versus Feature Release
An LTS release is supported for as long as its source is maintained. A feature release gets no IBM support, and version 26 and earlier feature builds no longer receive security fixes, so move any of them to a supported LTS line.
Semeru Runtimes Support Lifecycle and Release Cadence
The Semeru Runtimes are free to download and use in personal and commercial enterprise environments. Their release cadence tracks upstream OpenJDK: a new build every six months, an update each quarter, and every two years one build becomes the next LTS. Each package pairs OpenJDK class libraries with a virtual machine (JVM) from Eclipse OpenJ9, and IBM tests both for mission-critical work. The terms are a standard license for personal and commercial use, and the same build ships inside many IBM products.
Long Term Support Policy
Under the long term support policy, IBM keeps an LTS stream available, at a minimum, while its source is actively maintained. A new LTS appears every two years, so each lifecycle overlaps the next one.
OpenJDK and OpenJ9 Security Updates
Quarterly security updates and bug fixes are free. For library problems use the JDK bug system; for VM problems use the community channels. Free support from those communities is always available, while enterprise-grade support comes from IBM Runtimes for Business, a commercial support offering. Support entitlement also comes bundled with an IBM product that includes the runtime, including the Certified Edition.
End of Service and End of Availability Explained
End of service is when IBM expects upstream work to stop, and end of availability marks the expected close of its maintenance stream. After those dates your existing binaries keep running, but no new fix pack will be published, so any new vulnerabilities stay open.
General Availability and End of Marketing
The release date is the latest date a build is offered to every user. For z/OS products IBM also publishes an announcement letter date, a withdrawn from market date, an end of marketing date and an extension availability window, for example 30 Sep 2028 for 17.0.
Lifecycle Dates by Operating System and Supported Platforms
When public support for an operating system version ends, the runtime can no longer be supported on it, so your lifecycle dates depend on both the Java version and the platform. Each platform below lists its minimum levels, and the architecture mix decides which builds you can run:
| Operating system | AArch64 | x64 | ppc64le |
|---|---|---|---|
| Red Hat Enterprise Linux 8.10, 9.6, 10.0 (Linux) | Yes | Yes | Yes |
| Ubuntu 22.04, 24.04, 26.04 | Yes | Yes | Yes |
| SUSE Linux Enterprise Server 15 SP 7, 16 | No | Yes | Yes |
| AIX 7.2 TL5, AIX 7.3 TL2 | n/a | n/a | ppc64 only |
| macOS 14, 15, 26 | Yes | 14 and 15 only | n/a |
| Windows 11, Windows Server 2016 to 2025 | n/a | Yes | n/a |
Linux Systems
Linux builds target IBM Z, IBM Power and x86 hardware, with Linux on ARM covered through AArch64. A Linux enterprise distribution such as Red Hat Enterprise Linux or Ubuntu (22.04, 24.04 and 26.04) is covered on every architecture, while SUSE Linux has no AArch64 build. IBM tests Ubuntu on all four architectures, and IBM lists Ubuntu 26.04 too. On this platform these IBM Z models are supported by IBM:
- IBM z17
- IBM z16
- IBM z15
- IBM z14
- IBM z13
Linux on POWER adds IBM POWER9, IBM Power10 and IBM Power11, so check the SDK for your Linux build and the platform it targets.
AIX Systems
AIX needs POWER8 or later, so AIX 7.2 and AIX 7.3 both qualify. These IBM processors are supported on AIX:
- IBM POWER8 with AIX
- IBM POWER9 with AIX
- IBM Power10 with AIX
- IBM Power11 with AIX
Power10 and Power11 run in Power9 compatibility mode on AIX 7.2, and fully on AIX 7.3. Version 25 on AIX requires the XL C++ runtime.
macOS Systems
macOS 14 and macOS 15 run on x64 and AArch64, while macOS 26 requires level 26.3 or later, and only on AArch64.
Windows Systems
Windows support covers 64-bit x64 only, from Windows 11 through Windows Server 2025, so Windows on ARM is not listed.
IBM i and z/OS
IBM i and z/OS follow their own pages, because the support guide here does not apply to them. The IBM SDK for Java on z/OS is a no-charge download as a Pax edition or through SMP/E, and the SDK Java code is zIIP eligible. The Certified Edition for z/OS 17.0 moves to sustained support on 30 Sep 2026.
Planning Your Upgrade Before End of Support
Before end of support arrives, pick the next LTS and migrate your platform. Version 25 gives the longest runway, to 2031. Move your Docker image tag first, because every platform you run on needs the new tag, run the Eclipse AQAvit-tested build in staging, then roll it out. If you run the older IBM SDK, Java Technology Edition, see the separate IBM Java SDK page.